Tired of drowning in spreadsheets, wrestling with post-its, and enduring endless update meetings? You’re not alone. Countless project managers struggle with inefficient processes, wasting valuable time and energy keeping projects on track. But what if there was a better way?
Enter project management software, your one-stop shop for streamlined workflows, boosted productivity, and clear project visibility. With the right tool, you can ditch the chaos and take control, unlocking a world of smoother collaboration, enhanced efficiency, and happier teams.
In this guide, we’ll dive into the world of project management software, answering your burning questions:
- What is it? We’ll demystify the jargon and explain exactly how this software can transform your project management game.
- What to look for? We’ll guide you through the essential features to consider when choosing the perfect software for your needs.
- Top contenders! We’ll unveil a curated list of the best project management software options available in 2024, catering to a variety of budgets, team sizes, and project types.
So, grab a coffee and ditch the frustration. It’s time to discover how project management software can empower you to lead thriving, successful projects with ease.
Ready to conquer your project dreams? Let’s dive in!
What is Project Management Software?
Tired of juggling deadlines, budgets, and scattered spreadsheets? Enter project management software, your key to conquering chaos and achieving project success.
What is it? Simply put, project management software (PMS) is a digital tool specifically designed to streamline the way you plan, execute, and track projects. Imagine a central hub where tasks, communication, budgets, and resources all come together – that’s what PMS brings to the table.
Related: What are the best PPM tools for 2024?
Here’s what you can do with a good PMS:
- Plan and prioritize like a pro: Break down projects into manageable tasks, set deadlines, and assign resources with ease.
- Keep everyone on the same page: Collaborate in real-time with your team, share documents, and track progress – all within the software.
- Say goodbye to spreadsheets: Ditch the endless rows and columns and manage budgets, expenses, and resource allocation effortlessly.
- Boost your team’s efficiency: Automate repetitive tasks, track time effectively, and improve overall project visibility.
- Make informed decisions: Access real-time data and reports to identify roadblocks, adjust resources, and ensure project success.
But wait, there’s more! PMS empowers not just project managers, but entire teams – from developers to designers, marketers to sales – to work together seamlessly and achieve their goals.
Ready to experience the magic of project management software? Stay tuned for our next section, where we’ll explore the key features to consider when choosing the perfect PMS for your needs.
What makes a good Project Management Software?
Choosing the Right Tool: 5 Must-Have Features in Project Management Software
Drowning in to-do lists, tangled in communication threads, and desperately juggling deadlines? You’re not alone. Running successful projects is a complex dance, and finding the perfect project management software (PMS) can be your game-changing partner.
But with so many options out there, how do you choose the right one? Worry not, project manager extraordinaire! Here are the 5 essential features to look for in your dream PMS:
1. Task Management:
Say goodbye to scattered sticky notes and endless email chains. A top-notch PMS lets you create, assign, and track tasks effortlessly. With clear deadlines, priorities, and statuses, your team stays on the same page, conquering tasks like champions.
2. Scheduling:
Time is precious, and a good PMS keeps it under control. Look for intuitive scheduling tools like calendars, Gantt charts, and milestone trackers. Visualize your project timeline, identify deadlines, and ensure smooth execution from kickoff to completion.
3. File-Sharing:
No more hunting for documents in email black holes! A PMS with seamless file sharing keeps all your project files organized and accessible. Share, edit, and collaborate on documents in real-time, boosting efficiency and eliminating frustrating file hunts.
4. Communication:
Clear communication is the lifeblood of any project. Choose a PMS with built-in communication tools like messaging, discussions, and activity streams. Foster collaboration, resolve issues quickly, and keep everyone in the loop with just a few clicks.
5. Reporting:
Knowledge is power, and a PMS with robust reporting features gives you the power to monitor progress. Generate insightful reports on task completion, resource allocation, and project milestones. Stay informed, identify potential roadblocks, and make data-driven decisions to keep your project sailing smoothly.
With these 5 essential features as your compass, you’re well on your way to finding the perfect project management software for your needs.
However, if you want to up your project management game, you may want to consider project business management. Project Business Management is about managing all your operational and financial activities of projects in a single business system, which goes way beyond typical project management practices. Although most of the applications in this list are not considered project business management solutions, except for Adeaca PBA, many of them can do basic project management.
Stay tuned for our next section, where we’ll unveil the top 21 contenders in the PMS arena, ready to help you conquer your project management goals!
1. Project Business Automation
![Top 21 Best Project Management Software: An Overview - MeisterTask Adeaca Project Business Automation](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/Adeaca-PBA-project-management-screens-logo-blue3x2.png.webp)
Struggling to manage intricate projects with siloed data and clunky software? Adeaca Project Business Automation (PBA) might be your knight in shining armor. More than just project management software, PBA is a comprehensive project business system designed for enterprise organizations tackling high-stakes, complex projects.
Built for Enterprises, Powered by Agility:
Forget juggling spreadsheets and disconnected applications. PBA seamlessly integrates project planning, resource allocation, finances, and reporting into a single, unified platform. This translates to:
- Real-time project visibility: Access a single source of truth for project data, empowering informed decision-making and quick course corrections.
- Unparalleled control: Manage project budgets, schedules, and operations with precision using both Cost Breakdown Structure (CBS) and Work Breakdown Structure (WBS) within the system. Govern project processes with ease.
- Smarter project planning: Streamline project inception with PBA’s Project Modeler, generating optimal schedules and financial estimates right from the get-go.
Financial Finesse for Project Success:
PBA goes beyond basic task management. Its robust financial capabilities include:
- Built-in metrics and analysis: Track EAC, CTC, variance, and more, enabling proactive financial management and informed resource allocation.
- Integrated project scheduling: Align finances with real-time project timelines, eliminating costly rework and delays.
- Automated risk management: Monitor project health with the RAIDO register, keeping risks, assumptions, issues, and dependencies in check.
- Predictive insights: Leverage Project Autopilot for automated alerts and exception-based management, anticipating potential roadblocks before they arise.
Tailored Solutions for your Enterprise:
Built on the powerful Microsoft Dynamics 365 platform, PBA offers:
- Enterprise-grade security and scalability: Trust PBA to handle mission-critical data with confidence.
- Customization options: Configure PBA to fit your specific workflows and processes.
- Seamless integrations: Connect PBA with your existing ERP, Power BI, and other essential tools.
Ready to take your project management to the next level? Adeaca PBA might be the missing piece your team needs.
Learn more about Project Business Automation: Download the PBA Quick Guide now.
Pricing: Adeaca offers PBA to enterprise and therefore does not disclose its pricing on its website. However, its pricing model is designed to align with the value it provides it customers. For more information contact Adeaca.
Website: www.adeaca.com
2. MeisterTask
![Top 21 Best Project Management Software: An Overview - MeisterTask](https://www.adeaca.com/blog/wp-content/uploads/2024/01/meistertask-project-management.webp)
Drowning in messy to-do lists and struggling to keep your team on track? Look no further than MeisterTask, the sleek and user-friendly project management software that puts your to-dos in beautiful visual order.
Kanban Done Right:
Built around the popular Kanban method, MeisterTask transforms your projects into intuitive boards with color-coded cards representing tasks. Drag and drop cards between stages, prioritize with ease, and enjoy instant visual clarity on workflow progress.
Effortless Collaboration:
MeisterTask makes teamwork a breeze with features like:
- @mentions: Quickly notify colleagues about relevant tasks.
- Watching: Stay in the loop on updates without getting overwhelmed.
- Tags: Organize tasks across projects with intuitive keywords.
- Task scheduling: Set deadlines and keep teams in sync.
Beyond the Basics:
MeisterTask packs a punch beyond basic task management, offering unique features like:
- My Agenda: Pin tasks from any project to a personal board for ultimate focus.
- Automations: Streamline workflows with automated actions and triggers.
- Integrations: Connect MeisterTask to your favorite tools like G Suite, Slack, and GitHub.
Pricing:
MeisterTask provides flexible plans to fit your budget:
- Free Basic: Get started with core features for individual users.
- Pro ($14.50/month): Unlock more features for single users.
- Business ($29/month): Perfect for collaborating teams.
- Enterprise (custom pricing): Tailored solutions for larger organizations.
Website: www.meistertask.com
To help with your evaluation, download the Project Management Software requirements checklist.
3. Basecamp
![Top 21 Best Project Management Software: An Overview - Basecamp](https://www.adeaca.com/blog/wp-content/uploads/2024/01/basecamp-project-management-1024x617.webp)
Looking for a project management software that prioritizes ease of use and team communication? Basecamp might be your perfect match. This popular platform has become a go-to for teams seeking a straightforward approach to managing projects and staying in sync.
Key Basecamp Features:
- Collaboration at Its Core:
- Centralized Discussions: Keep conversations focused and organized with dedicated discussion areas within projects.
- Daily Recaps in Your Inbox: Stay on top of progress with convenient daily email updates summarizing project statuses and activities.
- Email-Friendly Interactions: Contribute to discussions directly from your inbox, making collaboration seamless for everyone.
- Staying Organized, Effortlessly:
- Powerful Search: Locate files, conversations, or any other project details in a flash using Basecamp’s robust search capabilities.
- Simple Interface: Navigate projects and tasks with ease thanks to Basecamp’s intuitive design and minimalist approach.
Things to Consider:
- Limited Customization: Basecamp offers fewer options for tailoring its features and workflows compared to some more comprehensive project management tools.
- Task Management Basics: Tasks can’t be assigned to multiple users, and setting estimated durations or tracking milestones isn’t currently supported.
Pricing:
- Basecamp: $15/user per month
- Basecamp Pro Unlimited: $349/month for unlimited users and projects
Is Basecamp the Right Fit for Your Team?
If you value simplicity, clear communication, and a no-frills approach to project management, Basecamp is definitely worth exploring. Its focus on collaboration and ease of use makes it a popular choice for teams seeking a streamlined way to stay aligned and get work done.
Website: www.basecamp.com
4. Nifty
![Top 21 Best Project Management Software: An Overview - NiftyPM](https://www.adeaca.com/blog/wp-content/uploads/2024/01/Nifty-project-management.webp)
Looking for a project management software (PMS) that streamlines workflows, inspires your team, and keeps projects on track? Look no further than Nifty, a new-wave tool designed to elevate project development.
Nifty brings all the essential PMS features under one roof:
- Milestone-Driven Progress: Stay focused on key objectives with a clear roadmap, keeping your team motivated and organized.
- Flexible Views: Manage tasks your way, choosing between Kanban boards or classic list views.
- Built-in Collaboration: Foster seamless teamwork with project-specific discussion threads and seamless file sharing.
- Calendar Integration: Stay in sync with Google Calendar integration and keep everyone on the same page.
- Github Connect: Encourage seamless cross-departmental collaboration through Nifty’s unique Github integration.
Pricing:
Nifty scales with your team, offering affordable plans:
- Free: 2 active projects
- $9/member per month: 40 active projects
- $16/member per month: 100 active projects
- $25/member per month: unlimited projects
- Enterprise: contact sales
Website: www.niftypm.com
5. Hive
![Top 21 Best Project Management Software: An Overview - Hive](https://www.adeaca.com/blog/wp-content/uploads/2024/01/Hive-project-management.webp)
Tired of juggling multiple tools and scattered conversations? Enter Hive, a project management platform that unites everything you need in one central dashboard.
Manage Everything around projects, effortlessly:
- 6 Flexible Project Views: Choose your perfect workflow with options like Gantt charts, Kanban boards, calendars, and tables.
- Built-in Communication: Chat with colleagues, send emails, and even launch Zoom calls – all within Hive.
- Collaboration Tools: Foster seamless teamwork with native chat, collaborative notes, time tracking, and goal tracking.
- AI-Powered Insights: Leverage Hive’s intelligent writing tool for enhanced efficiency.
- Democratic Development: Shape the future of Hive! Submit and vote on features through the Hive Forum.
Accessible Anytime, Anywhere:
- Web-based access: Work from any device with your browser.
- Desktop apps: Stay productive offline with dedicated Mac and Windows apps.
- Mobile apps: Manage projects on the go with Android and iOS apps.
Pricing:
- Start your journey with a free plan
- Starter: $7/month per user
- Teams: $18/month per user
- Enterprise: get in touch
Website: www.hive.com
6. ProofHub
![Top 21 Best Project Management Software: An Overview - ProofHub](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/ProofHub-project-management-1024x409.png.webp)
Drowning in project complexity? ProofHub might be your life raft. This online project management app prioritizes simplicity and clarity, empowering small and growing businesses to streamline workflows and collaborate effortlessly.
Focus on What Matters:
- Intuitive Interface: Ditch the learning curve with ProofHub’s user-friendly design. Manage projects and teams with ease, regardless of technical expertise.
- Customizable Roles: Define user permissions and access with granular control. Create bespoke roles to fit your unique team structure and needs.
- Comprehensive Features: ProofHub is your all-in-one hub, featuring:
- Task Management: Assign tasks, prioritize workloads, and track progress seamlessly.
- Workflows and Boards: Visualize your process with Kanban boards and customized workflows.
- Gantt Charts: Plan and schedule projects with clarity and precision.
- Reports and Time Tracking: Gain valuable insights with detailed reports and accurate time tracking.
- Discussions and Chat: Foster transparent communication through project-specific discussions and instant chat.
- Calendar, File Management, Notes, and more: Stay organized and connected with comprehensive tools for every aspect of your project.
Pricing for Every Stage:
ProofHub scales with your needs, offering flexible plans:
- Essential: $50/month
- Ultimate Control: $99/month Unlimited projects, 20 users, and 50GB storage.
Website: www.proofhub.com
7. Zoho Projects
![Top 21 Best Project Management Software: An Overview - Zoho Projects](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/zoho-project-management-1024x500.png.webp)
Zoho Projects: Your All-in-One Hub:
Looking for a project management software (PMS) that offers comprehensive features without sacrificing ease of use? Zoho Projects might be your perfect match. This extensive platform combines powerful functionality with a clean and intuitive interface, helping teams of all sizes tackle projects with clarity and efficiency.
- Streamlined Project Planning: Break down projects into manageable tasks, set deadlines, and prioritize workloads with ease.
- Visualize Progress with Gantt Charts: Gain a clear understanding of your project timeline and identify potential roadblocks early on.
- Robust Reporting Tools: Track progress, analyze data, and generate insightful reports to inform decision-making.
- Seamless Collaboration: Foster teamwork with built-in chat, discussions, and file sharing. Connect with consultants, vendors, employees, and clients seamlessly.
- Organized Document Management: Keep all your project documents centralized and accessible for everyone involved.
- Integration Powerhouse: Connect Zoho Projects with tools you already use, like Google Apps and Dropbox, for effortless workflow.
Pricing for Every Need:
Zoho Projects offers flexible plans to fit your budget and project requirements:
- Free Plan: Get started with essential features for 2 projects and 5GB storage.
- Premium Plan ($5/user/month): unlimited projects, 20 templates, and 100GB storage.
- Enterprise Plan ($10/user/month): unlimited projects, 30 templates, and 120GB storage.
Website: www.zoho.com/projects/
8. Trello
![Top 21 Best Project Management Software: An Overview - Trello](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/Trello-project-management.png.webp)
Tired of juggling spreadsheets and countless documents to track your projects? Trello offers a refreshingly visual approach to project management. This intuitive Kanban tool transforms your tasks into colorful cards, bringing your entire project to life in a single, dynamic view.
See It All at a Glance:
- Visualize Your Workflow: Create boards for different projects and organize tasks into clear columns, making progress instantly visible.
- Move Tasks with a Click: Drag and drop cards between columns to represent different stages, streamlining workflows and keeping everyone on the same page.
- Collaborate in Real-Time: Share boards with team members, assign tasks, add comments, and attach files, fostering seamless collaboration and communication.
Cards for Endless Versatility:
- Capture Everything: Use cards to represent tasks, ideas, conversations, to-do lists, feedback, and more.
- Add Rich Details: Include descriptions, checklists, due dates, labels, and attachments to each card, keeping all essential information organized and accessible.
Pricing for Every Team:
Trello’s flexible plans accommodate teams of all sizes and budgets:
- Free Plan: Get started with unlimited cars, 10 boards per workspace, etc., making it perfect for individuals and small teams.
- Standard: $6/user/month for unlimited boards and larger file size.
- Premium: $12.50/user/month with advanced features such as views and command runs.
- Enterprise: $17.50/user/month for advanced security, administrative controls, and priority support for large organizations with complex needs.
Website: www.trello.com
9. JIRA
![Top 21 Best Project Management Software: An Overview - Jira](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/Jira-project-management-1024x629.png.webp)
Agile teams, unite! JIRA, the project management software designed specifically for software development, empowers you to embrace agile methodologies and deliver exceptional results. Plan, track, collaborate, and iterate with ease, fostering a culture of continuous improvement and accelerated innovation.
Key Features for Agile Workflows:
- Customizable Scrum and Kanban Boards: Choose the visual framework that aligns with your team’s style and create boards tailored to your unique workflow.
- Real-Time Agile Reporting: Gain instant insights into project progress, identify bottlenecks, and make data-driven decisions to optimize your process.
- Comprehensive Issue Tracking: Seamlessly log, assign, and manage bugs, tasks, and user stories, ensuring every detail is accounted for.
- Time Tracking for Effortless Resource Management: Monitor time spent on tasks to ensure accurate project forecasting and efficient allocation of developer time.
- Robust API for Seamless Integration: Connect JIRA with your favorite third-party tools to create a unified development ecosystem.
Pricing Options for Every Size:
- Free: 10 users and 2 GB storage
- $8.15/user/month: 250 GB storage and up to 35,000 users
- $16/user/month: unlimited storage, premium support and other features
- Enterprise: contact sales for advanced options such as security controls
Website: www.atlassian.com/software/jira
10. Asana
![Top 21 Best Project Management Software: An Overview - Asana](https://www.adeaca.com/blog/wp-content/uploads/2024/01/Asana-project-management.webp)
Seeking a project management tool that adapts to your unique needs and keeps your team aligned effortlessly? Look no further than Asana. This versatile project management software empowers you to organize tasks, visualize progress, and focus on what matters most—all within a collaborative workspace.
Key Asana Project Management Features:
- Custom Fields for Personalized Tracking: Tailor Asana to track precisely what’s important to you, ensuring visibility into every critical detail of your projects.
- Tasks, Projects, and Dashboards: Organize work seamlessly, create clear project structures, and visualize progress with informative dashboards.
- Team Pages for Collaborative Conversations: Foster open communication and idea sharing with dedicated spaces for team discussions.
- Smart Box for Focused Updates: Receive only the most pertinent project updates, reducing inbox clutter and keeping you focused on essential information.
- Seamless Integrations: Connect Asana with your favorite tools, including Google Drive, Dropbox, GitHub, MailChimp, and more, for a unified workflow.
Pricing Plans for Every Team:
- Personal (Free): Get started with core features for simple project management and collaboration.
- Starter ($13.49/user/month): For growing teams that need to track their projects’ progress and hit deadlines.
- Advanced ($30.49/user/month): For companies that need to manage a portfolio of work and goals across departments.
- Enterprise (Pricing upon request): For companies that need to coordinate and automate complex work across departments, without limits.
- Enterprise (Pricing upon request): For companies that need to meet strict compliance requirements with flexible, precise controls.
Website: www.asana.com
11. Monday.com
![Top 21 Best Project Management Software: An Overview - Monday.com](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/Monday-project-management-4-1024x660.jpg.webp)
Tired of project management tools that force you to adapt to their rigid structure? Monday.com flips the script, empowering you to create workflows that perfectly align with your unique processes and priorities. Design a visual workspace that reflects your team’s way of working, and experience seamless collaboration and effortless tracking.
Key Project Management Features:
- Flexible Workflow Creation: Start by designing a workflow that mirrors your exact needs, whether it’s managing a product launch, tracking sales leads, or planning a marketing campaign.
- Visualize Key Elements: Highlight time management, text, locations, or any other crucial information to make project details instantly clear and actionable.
- Collaboration Made Easy: Share your workflows with your entire team, ensuring everyone is on the same page and working towards common goals.
- Focus on What Matters: Streamline communication and documentation by recording only the most important conversations and files, saving time and reducing clutter.
Pricing Plans to Suit Your Team:
- Free (for 2 users): For individuals looking to keep track of their work.
- Basic ($12/seat/month): Manage all your team’s work in one place.
- Standard ($14/seat/month): Collaborate & optimize your work across teams.
- Pro ($24/seat/month): Streamline complex workflows at scale.
- Enterprise (Pricing available upon request): Enjoy tailored solutions for large organizations with complex needs and security requirements.
Website: www.monday.com
12. Wrike
![Top 21 Best Project Management Software: An Overview - Wrike](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/Wrike-project-management-2.jpg.webp)
Looking for a project management tool that seamlessly blends collaboration, task management, and budget control? Wrike is your cloud-based solution. Keep simple projects and simple tasks on track, meet deadlines, and stay within budget with Wrike’s intuitive features and integrations, empowering your team to work together effortlessly.
Key PMS Features:
- Task Management Mastery: Create, assign, and track tasks with ease, ensuring everyone knows their responsibilities and deadlines.
- Real-Time Collaboration: Foster seamless communication and teamwork with shared workspaces, comments, and file attachments, keeping everyone aligned.
- Budget and Timeline Control: Ensure projects stay within scope and budget with built-in tools for tracking costs, resources, and timelines.
- Integration Powerhouse: Connect Wrike with your favorite business tools, such as Google Apps, Microsoft Excel, Dropbox, and more, for a unified workflow.
- Transform Emails into Tasks: Seamlessly create tasks directly from your email inbox, saving time and keeping project-related communication organized.
Pricing Plans for Every Team:
- Free: Get started with core features for small teams and basic project management.
- Team ($9.80/user/month): Unlock advanced features like Gantt charts, time tracking, and custom fields for enhanced functionality.
- Business ($24.80/user/month): Enjoy enterprise-grade security, reporting, and unlimited projects for growing teams.
- Enterprise (Pricing available upon request): Custom solutions for large organizations with complex needs and security requirements.
Website: www.wrike.com
13. Adobe Workfront
![Top 21 Best Project Management Software: An Overview - Adobe Workfront](https://www.adeaca.com/blog/wp-content/uploads/2024/01/Adobe-workfront-project-management.webp)
Looking for a project management software that empowers your team to visualize progress, prioritize tasks, and collaborate seamlessly? Perhaps look into Adobe Workfront. This user-friendly platform elevates project management to an art form, equipping you with the tools and insights needed to deliver exceptional results, every time.
Key Features:
- Customizable Dashboards: Build dashboards that reflect your unique workflow and provide instant visibility into project progress, tasks, and key metrics.
- Real-Time Reporting: Gain actionable insights on the fly, making data-driven decisions and adjustments to ensure every project stays on track.
- Crystal-Clear Visibility: View all your ongoing tasks and operations in one central location, eliminating confusion and fostering collaboration.
- Capacity Planning and Prioritization: Optimize resource allocation and ensure workload balance with intuitive tools for planning and prioritizing tasks.
- Proactive Workflow Notifications: Keep your team informed with automatic notifications for new projects, deadlines, and changes in work progress.
- Seamless Integrations: Streamline your workflow by connecting Workfront with the tools you already use, like Adobe Creative Cloud, Google Drive, and Microsoft Outlook.
Pricing for Every Goal:
Adobe Workfront’s pricing plans are tailored to the specific needs and complexities of your organization. Contact their sales team to discuss your requirements and receive a customized quote.
Website: www.workfront.com
14. Hubstaff
![Top 21 Best Project Management Software: An Overview - Hubstaff](https://www.adeaca.com/blog/wp-content/uploads/2024/01/Hubstaff-project-management-1024x668.webp)
Embrace agile project management and achieve remarkable efficiency with Hubstaff, the project management software that automates workflows, streamlines communication, and empowers your team to focus on delivering exceptional results.
Key Features:
- Agile Methodology at the Core: Stay aligned with agile principles with features that support sprints, task prioritization, and automated stand-ups, fostering a culture of continuous improvement.
- Streamlined Workflow Automation: Eliminate manual tasks and create seamless processes to reduce time spent on administrative work and focus on value-adding activities.
- Effortless Collaboration: Share comments, project status updates, and files effortlessly within a centralized platform, keeping everyone on the same page and aligned with project goals.
- Stay on Track with Time Tracking: Monitor time spent on tasks and projects for accurate forecasting, resource allocation, and client billing, ensuring visibility and accountability.
Pricing:
- Starter: $7/user/month for basic functions and time tracking
- Grow: $9/user/month for basic functions and Tasks
- Team: $12/user/month for basic functions+Tasks+Insights
- Enterprise: $25/user/month for basic functions+Tasks+Insights+Locations+Corporate app
Website: www.hubstaff.com
15. LiquidPlanner
![Top 21 Best Project Management Software: An Overview - LiquidPlanner](https://www.adeaca.com/blog/wp-content/uploads/2024/01/LiquidPlanner-project-management.webp)
Say goodbye to rigid project management tools that force you to fit their mold. LiquidPlanner is different. This innovative project management software automatically adapts to your changing priorities and resources, empowering your team to navigate projects with agility and achieve remarkable results.
Key PM Features:
- Adaptive Intelligence: Let LiquidPlanner do the heavy lifting. The software automatically adjusts schedules and resource allocation based on real-time changes, keeping your projects on track even when the unexpected happens.
- Cross-Project Visibility: Gain a panoramic view of your entire project landscape. Get instant insights into progress, risks, and budgets across all projects simultaneously, making informed decisions at every step.
- Advanced Analytics: Dive deeper with powerful analytics tools. Track project performance, monitor resource utilization, analyze costs and profits, and identify trends – all in one centralized platform.
- Client Portfolio Management: Seamlessly manage and track client portfolios, ensuring efficient service delivery and exceeding client expectations.
- Scalable Solutions: LiquidPlanner offers flexible plans to meet the needs of growing teams. From small startups to large enterprises, find the perfect fit for your organization.
Pricing for Every Stage:
- Essentials ($15/user/month): Get started with core features for smaller teams and simple projects.
- Professional ($28/user/month): Unlock advanced features like timesheet review and rate sheets.
- Ultimate ($42/month): Unlock even more advanced features like SSO, access controls, and API.
Website: www.liquidplanner.com
16. Clickup
![Top 21 Best Project Management Software: An Overview - ClickUp](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/ClickUp-project-management-1024x569.png.webp)
Looking for a project management tool that seamlessly blends task management, agile workflows, and cross-team collaboration? Look at ClickUp. This versatile platform empowers you to customize your workflows, streamline processes, and achieve remarkable results, whether you’re managing sprints, juggling multiple projects, or working with distributed teams.
Related: ClickUp is also featured in the top PPM software solutions for 2024.
Key Project Features:
- Flexible Workflow Customization: Tailor ClickUp to fit your unique needs by creating custom workflows, assigning tasks, and setting dependencies to ensure a smooth and efficient process.
- Agile Excellence: Manage sprints with ease, track resources effectively, monitor team workloads, and foster collaboration across multiple teams, making ClickUp an ideal choice for agile teams.
- Task Management Mastery: Break down projects into manageable tasks, assign them to team members, set due dates, track progress, and collaborate in real-time to ensure everyone stays on track.
- Cross-Team Collaboration: Break down silos and create a unified workspace where teams can work together seamlessly, share files, and communicate effectively to achieve shared goals.
- Free Plan for Getting Started: Explore ClickUp’s core features with their free plan, making it accessible for teams of all sizes.
- Upgrade for Enhanced Functionality: Unlock advanced features like unlimited storage, custom fields, integrations, and priority support with their Unlimited or Business plans to cater to your growing needs.
Pricing for Every Team:
- Free: Get started for personal use.
- Unlimited ($10/user/month): Enjoy unlimited storage, views, and integrations for growing teams.
- Business ($19/user/month): Benefit from advanced features like custom exporting, advanced automations, and timesheets.
- Enterprise (contact sales): benefit from more advanced features like SSO, data residency, and APIs.
Website: www.clickup.com
17. TeamGantt
![Top 21 Best Project Management Software: An Overview - TeamGantt](https://www.adeaca.com/blog/wp-content/uploads/2024/01/TeamGantt-project-management-1024x646.webp)
Seeking a straightforward project management tool perfect for smaller businesses? Look no further than TeamGantt. This easy-to-use software gets you from setup to execution in no time, empowering your team to visualize progress, track deadlines, and collaborate effectively.
Here’s why TeamGantt is a great fit for small businesses:
- Quick and Easy Setup: Get up and running within hours, ditching complex onboarding and diving straight into managing your projects.
- Intuitive Gantt Charts: Visualize your entire project on a clear and collaborative Gantt chart, ensuring everyone sees the big picture and their individual tasks.
- Real-Time Team Collaboration: Invite colleagues to edit the Gantt chart, share files, and discuss details directly within the platform, streamlining communication and keeping everyone aligned.
- Affordable Pricing: Choose a plan that scales with your business, from a free option for basic needs to unlimited users and projects as your team grows.
While TeamGantt excels in simplicity and visual planning, its in-app communication features might not offer the advanced functionalities of dedicated collaboration tools. However, for smaller teams who prioritize straightforward project management and visual clarity, TeamGantt delivers exceptional value.
Pricing Highlights:
- Lite ($24/month/manager): 5 projects per manager, 150 tasks per project.
- Pro ($59/month/manager): 20 project per manager, unlimited tasks and collaborators.
- Unlimited everything (contact sales): for advanced features like unlimited projects per manager, custom boards, and RACI.
Website: www.teamgantt.com
18. Backlog
![Top 21 Best Project Management Software: An Overview - Backlog](https://www.adeaca.com/blog/wp-content/uploads/2024/01/Backlog-project-management.webp)
Bring your sales, development, and other teams together under one collaborative roof with Backlog, the project management software that bridges communication gaps and empowers teams to manage projects, tasks, and team-specific needs with ease.
Key Features for Unified Collaboration:
- Project and Task Management for All: Plan projects, assign tasks, track progress, and collaborate in real-time, ensuring everyone is on the same page, regardless of their department.
- Sales-Specific Features: Drive sales success with lead tracking, pipeline management, and customer relationship management (CRM) capabilities, all within Backlog’s unified platform.
- Developer-Friendly Tools: Streamline development workflows with issue tracking, code reviews, Git and SVN integration, and release management features, making Backlog a hub for efficient development.
- Cross-Team Communication: Break down silos and foster seamless collaboration with built-in chat, file sharing, and wiki features, ensuring teams stay connected and aligned.
- Customizable Dashboards: Keep important information at your fingertips with customizable dashboards that display project progress, task status, and team performance metrics.
Pricing to Match Your Needs:
- Free: for small projects: up to 10 users
- Starter ($35/month): up to 30 users
- Standard ($100/month): unlimited users, but only 100 projects, plus additional features such as Gantt charts and Issue templates.
- Premium ($175/month): unlimited users and projects, plus advanced features such as customized fields and dedicated support.
Website: www.backlog.com
19. Celoxis
![Top 21 Best Project Management Software: An Overview - Celoxis](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/celoxis-project-planning-1024x576.png.webp)
Tired of juggling project complexity and messy spreadsheets? Meet Celoxis, a top-rated project management software that simplifies planning, tracking, and reporting for teams of all sizes.
Intuitive and Responsive:
- Breeze through project setup with Celoxis’ clean and responsive interface.
- Visualize deadlines and dependencies with the clear Gantt chart view.
- Track time, budget, and project income with ease using built-in financial tools.
Reporting Powerhouse:
- Celoxis truly shines with its advanced reporting engine.
- Dive deep into project data with drill-down charts and time-phrased insights.
- Generate flexible and shareable reports that keep everyone informed.
Deployment Options:
- Choose the SaaS plan for cloud-based access and automatic updates.
- Opt for on-premise hosting if you prefer data control.
Website: www.celoxis.com
20. Plutio
![Top 21 Best Project Management Software: An Overview - Plutio](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/Plutio-project-management-1024x657.jpg.webp)
Tired of juggling multiple tools for project management, proposals, and invoicing? Plutio is your one-stop solution, streamlining your workflow and boosting team productivity that is best for solopreneurs or small teams.
Stay Organized and Efficient:
- Manage projects and tasks: Create, assign, and track tasks with ease, ensuring everyone stays on top of their workload.
- Craft winning proposals: Impress clients with professional proposals built within Plutio, complete with e-signatures for smooth approvals.
- Send invoices in a flash: Get paid faster with quick and easy invoice creation and automated reminders.
- Track time anywhere: Log time spent on projects and tasks from any device, providing valuable insights for better resource allocation.
- Powerful time-sheet visualization: See everyone’s time entries in a clear and concise format, boosting transparency and accountability.
Plutio empowers you to:
- Save time and money by ditching multiple tools and subscriptions.
- Improve communication and collaboration across your team.
- Gain valuable insights with real-time data and reporting.
- Deliver projects on time and within budget.
Pricing:
- Solo ($19/month)
- Studio ($39/month)
- Agency ($99/month)
Website: www.plutio.com
21. ProjectManager.com
![Top 21 Best Project Management Software: An Overview - ProjectManager.com](https://www.adeaca.com/blog/wp-content/webp-express/webp-images/uploads/2024/01/projectmanager-com-planning-1024x654.jpg.webp)
Streamline Your Projects and Empower Your Team with Flexible Features and Real-Time Insights
Last but not least, are you looking for project management software that delivers results without breaking the bank? ProjectManager.com has you covered. This award-winning tool offers a robust set of features to help teams of all sizes plan, track, and execute simple projects successfully.
Key Features:
- Task Management: Effortlessly organize and prioritize tasks, with remote update capabilities for flexibility.
- Time Tracking: Accurately track time spent on tasks to stay on budget and identify areas for improvement.
- Gantt Charts: Visualize project timelines, dependencies, and milestones for clear progress tracking.
- Project Planning: Create comprehensive project plans with ease, ensuring everyone is aligned from the start.
- Real-Time Dashboard: Gain instant insights into project status, team performance, and potential risks.
Pricing That Fits Your Team:
- Team: $16/user/month
- Business: $28/user/month
- Enterprise: Custom pricing available
Website: www.projectmanager.com
Choosing your project management software
In order to choose the right project management software, it’s important to consider factors such as the size of your business and team, how many features you require and which of those features you most value. Either way, I think you’ll quickly realize that having such a software in place will make your day-to-day work much easier.
To help select the right project software based on your needs, check out this Project Management Requirements template. This document will help you define your requirements and make a sound selection based on facts.
We hope this overview has given you some inspiration in choosing which project management software might be right for your business. If you have any suggestions or know of other great project management software, please feel free to reach out to us.